Over at Fishponds work has just started on extending the street lighting of the Bristol & Bath Railway Path from Ridgeway Road to Staple Hill Tunnel. The work involves digging a trench alongside the Path for the electricity cables and a certain amount of disruption and visual impact is inevitable, but some Path users have expressed concern at the extent of the impact on the once green corridor.
One can understand that a certain amount of cutting back of existing vegetation is required, including the removal f trees that have grown too close to the Path. As a general principle about a metre or so of grass verge should be maintained either side of the tarmac path itself to ensure that the full width can be used and to ensure reasonable sight lines. Lighting also needs to be clear of envelopment by adjacent foliage. But the contractors seem to be taking things too far.
It seems pretty clear that many mature trees well over a metre from the Path have been felled. Is this really necessary? The effect is devastating, reminding me of how the old railway looked back in the early 1980s before the Path was built. Of course the vegetation will grow back but the trees will take decades to recover. The importance of the 'greenness' of the Railway Path corridor cannot be overstated. It was the loss of the 'green' quality that above all prompted thousands to protest against Bristol City Council's recent plans to build a BRT bendy bus track along the Path.
At least one complainant has taken the initiative of emailing Bristol's 'Transport Supremo' Jon Rogers about this and I urge others to do the same. We know from bitter experience over many years, indeed decades, that we cannot entrust the care of the Railway Path to the local authorities. They lack the awareness of the sensitivities that rightly attach to the Railway Path which still represents a rare example of the popular will overcoming bureaucratic intransigence.
Showing posts with label cycle paths. Show all posts
Showing posts with label cycle paths. Show all posts
Wednesday, 20 January 2010
Wednesday, 1 July 2009
Cycling City - New for Old
There's an interesting debate going on in connection with Cycling City. What constitutes a "new" route as opposed to an existing route that has been improved in some way? The latest installment in this debate occurred yesterday with this story in the Evening Post claiming that "Two new links from the Bristol and Bath Railway Path could benefit cyclists and walkers living in Speedwell, St George, Redfield and Whitehall ".

The routes in question, shown on the map above (click to enlarge) by #24 and #25, are essentially existing routes (shown on the map below) which are already used by cyclists. However 'improvements' are proposed, including such things as light controlled road crossings and improved surfaces and realignments in places. So is it right to call them "new links"? As you can see from the comments on the article I accused the council of 'lying' over this use of the word "new" but Jon Rogers, the Executive Member for Transport, said -

The as yet non-existent link to Speedwell, actually built in 1980s.
The problem dates back to the beginning of the Cycling City project. For example the promotional leaflet issued in February of this year, at the first (so far) relaunch, included the map above which shows proposed "new infrastructure" (dark blue lines) and "new infrastructure on existing network" (broad cerise lines). So clearly the "new infrastructure" (dark blue) is by implication NOT on the existing network.
But the St Werburghs route (#2 on map above), which might reasonably be described as "new infrastructure on existing network" is in fact marked in dark blue and therefore as "new infrastructure" NOT on the existing network. Likewise the proposed "new link" to Speedwell (#24 on the map above) is shown as "new infrastructure" (dark blue) when it is in fact based on the existing network and so should properly be marked cerise). Are these "sterile and pedantic" distinctions?
Oddly enough the other "new link" (to St George) claimed in yesterday's Post story is shown merely as "existing network", but for a small element within it. So they can get it right occasionally, if only because they can't manage to be consistent about anything, even their deceits. The map shows many other examples of existing routes which are misrepresented as "new infrastructure", in fact most of what is marked in dark blue within the Cycling City area is existing cycle route.
Cycling City claims that it will deliver "13 miles of new track and 18 miles of improvements to the existing 73 miles of off-road track". So far, one year into the three year project, they have delivered less than half a mile of improved track. The 13 miles figure is pure fiction (and probably the other figures too, although I'm not yet in a position to prove that) and that fact will continue to be exposed on this blog until such time as the council come clean and withdraw all the false claims made in support of Cycling City.

The routes in question, shown on the map above (click to enlarge) by #24 and #25, are essentially existing routes (shown on the map below) which are already used by cyclists. However 'improvements' are proposed, including such things as light controlled road crossings and improved surfaces and realignments in places. So is it right to call them "new links"? As you can see from the comments on the article I accused the council of 'lying' over this use of the word "new" but Jon Rogers, the Executive Member for Transport, said -
This is a public consultation to create two new cycle links. True, the paths already exist, but the plan is to consult local residents and users of the Railway Path on improvements to the links to make them more suitable for cycling and walking. Words like "upgraded" or "improved" might strictly be more accurate than "new", but to accuse Bristol City Council of "lying" seems a bit strong.The council press release for the opening of the St Werburghs path said "Bristol's trailblazing Cycling City programme has delivered the first completed kilometre of a new off-road cycle route". Note "route" rather than "path", so the "new" claim refers to the overall existence of the route, not some facet of it such as the new asphalt surface of the path. Yet it is well known that the very same route has been used by cyclists for at least the last 20 years.
Chris, we had the same sterile and pedantic discussion on the St Werburghs to Muller Road path, but if you travel along it you will see there is a "new path". The path is also "improved" and "upgraded".

The as yet non-existent link to Speedwell, actually built in 1980s.
The problem dates back to the beginning of the Cycling City project. For example the promotional leaflet issued in February of this year, at the first (so far) relaunch, included the map above which shows proposed "new infrastructure" (dark blue lines) and "new infrastructure on existing network" (broad cerise lines). So clearly the "new infrastructure" (dark blue) is by implication NOT on the existing network.
But the St Werburghs route (#2 on map above), which might reasonably be described as "new infrastructure on existing network" is in fact marked in dark blue and therefore as "new infrastructure" NOT on the existing network. Likewise the proposed "new link" to Speedwell (#24 on the map above) is shown as "new infrastructure" (dark blue) when it is in fact based on the existing network and so should properly be marked cerise). Are these "sterile and pedantic" distinctions?
Oddly enough the other "new link" (to St George) claimed in yesterday's Post story is shown merely as "existing network", but for a small element within it. So they can get it right occasionally, if only because they can't manage to be consistent about anything, even their deceits. The map shows many other examples of existing routes which are misrepresented as "new infrastructure", in fact most of what is marked in dark blue within the Cycling City area is existing cycle route.
Cycling City claims that it will deliver "13 miles of new track and 18 miles of improvements to the existing 73 miles of off-road track". So far, one year into the three year project, they have delivered less than half a mile of improved track. The 13 miles figure is pure fiction (and probably the other figures too, although I'm not yet in a position to prove that) and that fact will continue to be exposed on this blog until such time as the council come clean and withdraw all the false claims made in support of Cycling City.
Thursday, 25 June 2009
Cycling City - Slippery Customers
Bristol City Council's Press Release announcing the opening of the "new" path from St Werburgh's to Muller Road said that it "features a sensitive, solar powered ‘cats eye’ lighting scheme". Jon Rogers is quoted as saying "Path width and lighting were seen as sensitive issues for some residents. So we looked at a way of making the path safe and useable (sic) but without the glaring nuisance lighting." So here they are, the TraxEyes -

As you can see they're really quite small and discreet, 70mm in diameter and proud of the path surface by about 7 mm. So do they work? I checked a little after 10 pm last night when I took these pics so can confidently answer "no". The very most these studs will ever do is emphasise where the edges of the path are, mainly for the benefit of those using the path without lights on very dark nights. Anyone with half-decent lights would benefit far more from reflective material. The amount of light given off by the studs is absolutely minuscule and bears no resemblance to the pictures on the website.

Above is the close-up view at 10.22 pm last night, still twilight at this time of year but dark enough for lights to be necessary. The glow from the greenish plastic is barely visible and of absolutely no practical use. What the TraxEyes certainly will not do is help path users to see other path users which is what really matters. They may even give path users a false sense of security and result in more cyclists using the unlit path without adequate lighting, or cycling faster than they otherwise would because it's easier to see the alignment of the path.

The other question one might ask is "are they slippery?". The answer is yes, they are slippery if you attempt to brake or turn sharply while riding over them, especially in the wet. The example pictured above is particularly dangerous, being on a steeply sloping junction where cyclists are likely to be simultaneously turning and braking sharply (when they are suddenly confronted by a path user who they hadn't seen around the blind corner). If the tyre makes contact only with the plastic disc traction is greatly reduced and if combined with braking or turning, let alone both, the result is that you may well find yourself flat on the ground.
Now all of this has been flagged up before and, I understand, communicated to officers. So why have they gone ahead with the installation of these studs on a public path, presumably without first having carried out such simple tests as I did? If this path was a road open to motor traffic there would surely be no question of using these studs without Department of Transport authorisation following exhaustive safety tests. But it's just a path for cyclists and walkers so we get to be experimented on like laboratory rats.
As you can see they're really quite small and discreet, 70mm in diameter and proud of the path surface by about 7 mm. So do they work? I checked a little after 10 pm last night when I took these pics so can confidently answer "no". The very most these studs will ever do is emphasise where the edges of the path are, mainly for the benefit of those using the path without lights on very dark nights. Anyone with half-decent lights would benefit far more from reflective material. The amount of light given off by the studs is absolutely minuscule and bears no resemblance to the pictures on the website.
Above is the close-up view at 10.22 pm last night, still twilight at this time of year but dark enough for lights to be necessary. The glow from the greenish plastic is barely visible and of absolutely no practical use. What the TraxEyes certainly will not do is help path users to see other path users which is what really matters. They may even give path users a false sense of security and result in more cyclists using the unlit path without adequate lighting, or cycling faster than they otherwise would because it's easier to see the alignment of the path.

The other question one might ask is "are they slippery?". The answer is yes, they are slippery if you attempt to brake or turn sharply while riding over them, especially in the wet. The example pictured above is particularly dangerous, being on a steeply sloping junction where cyclists are likely to be simultaneously turning and braking sharply (when they are suddenly confronted by a path user who they hadn't seen around the blind corner). If the tyre makes contact only with the plastic disc traction is greatly reduced and if combined with braking or turning, let alone both, the result is that you may well find yourself flat on the ground.
Now all of this has been flagged up before and, I understand, communicated to officers. So why have they gone ahead with the installation of these studs on a public path, presumably without first having carried out such simple tests as I did? If this path was a road open to motor traffic there would surely be no question of using these studs without Department of Transport authorisation following exhaustive safety tests. But it's just a path for cyclists and walkers so we get to be experimented on like laboratory rats.
Wednesday, 3 September 2008
And now the truth is out
From time to time the curious blogger stumbles across some mysterious object buried in the shifting sands of bureaucratic verbiage. On poking and prodding a little the object slowly reveals itself, only to turn out to be a landmine that proceeds to blow up in the poor blogger's face.
At least that's how it feels today. This morning I decided that enough was known to register some formal objections about the land sell-off discussed in previous posts. So I sent this email to Bristol City Council.
Briefing Note - Land Adjacent to Former Elizabeth Shaw Chocolate Factory
Strip of land A (The embankment slope coloured blue - click on map to enlarge)

Squarepeg the owners of the Former Elizabeth Shaw Factory in Greenbank contacted the Council in December 2007 over the possible purchase of the land outlined in red on plan N5078b. This Council land is currently leased to the former owners of the Elizabeth Shaw Factory at a rent of £100 pa to be used for an access onto the cycle path and landscaping. Squarepeg's proposals are to incorporate the land within the redevelopment of the former chocolate factory site which is to be developed into a mixed use site of retail, business and residential units.
Several concerns were raised over the potential sale of the land by the Nature Conservation Officer and the Transport Development Control Manager. The initial response was that the Council would not wish to sell the land. Further discussions between chief officers in CLS (Culture and Leisure Services - Parks) and PTSD (Planning Transport and Sustainable Development) and George Ferguson from Squarepeg were held in May 2008. Instructions were subsequently given to Property Services to proceed with the possible sale of this land subject to the following conditions:
1. Squarepeg engage in dialogue with Council's Nature Conservation Officer to ensure the proposals provide necessary but reasonable compensating measures for the loss of vegetation and habitat.
2. The land sale will only be finalised if the developer receives planning permission and proceeds with the specific proposals.
3. Any structural changes to the bank will have to be agreed with the Council before works start. This is to protect BCC against works being carried out which undermine the cycle path.
4. The developer pay market value for the site.
The property was circulated as surplus in June 2008 with no department putting forward a operational requirement for the land within the four week circulation period. A formal offer from Squarepeg is awaited.
Strip of land b (The green verge of the Path along the boundary of the site, coloured green)
In July 2008 Squarepeg showed an interest in acquiring an easement or long lease of an additional strip of land outlined red on plan N5078c. This is required to access their development from the Bristol to Bath Cycle Path. They propose clearing land of vegetation and replacing with grass and landscaping. Squarepeg have confirmed that they would to maintain the site and continue to allow public access onto this land. Should the Council wish to proceed with a lease of the land it would need to advertise the proposal in the local newspaper and invite the public to comment. The matter may also need to be referred to the Parks & Green Spaces Board.
The Council is waiting for written proposals from Squarepeg as to the terms under which they will be looking to use this land.
David Bishop has indicated that he supports the grant of an easement (subject to certain conditions) as this development was referred to in the Cycle City bid application and is seen as a 'cycle friendly' development which will not compromise the future of the cycle path but could potentially improve it. David has indicated that he would be happy to discuss the development with any members should they have any issues with this proposal.
I've not had time to study this properly yet, but one section jumps out at me - "Several concerns were raised over the potential sale of the land by the Nature Conservation Officer and the Transport Development Control Manager. The initial response was that the Council would not wish to sell the land".
So it seems there was a real debate going on within the Council after all, as one would expect with such a contentious issue, but still they didn't see fit to put the matter out to consultation or even refer it to elected members of the Council, let alone inform the people of Bristol. Instead the matter appears to have been stitched up with a secret meeting between Merchant Venturer George Ferguson the Senior Officer David Bishop. That is how Bristol is run under our new £180k Chief Executive Jan Ormondroyd.
(for a follow up post click here)
At least that's how it feels today. This morning I decided that enough was known to register some formal objections about the land sell-off discussed in previous posts. So I sent this email to Bristol City Council.
Sale of Railway Path land, Greenbank
Further to enquiries made last week, I would like to register my concerns about the planned sale of Railway Path land at Greenbank, Bristol, in connection with the proposed development of the former chocolate factory. Having visited the site and discussed the matter with other concerned people, I feel that I must register an objection to the sale of this land to Squarepeg for the following reasons.
1. The land being sold forms an intrinsic part of the green corridor of the Railway Path. It is mainly the slope of the embankment on which the former railway was supported. Such structures are an integral part of the former railway and it now supports a continuous wall of mature vegetation, rising to over 5 metres above the Railway Path. The rural ambiance of the Railway Path, which is so highly valued by the majority of users and local residents, depends on such mature growth on the slopes of embankments and cuttings as well as that on the level margins of the Path
2. There does not appear to have been any consultation on whether the land should be sold. The City Council have apparently taken the view that they are not required to consult. This may be technically correct, but given the controversies that have arisen in relation to most previous attempts to develop elements of the Railway Path it would, I suggest, be prudent to consult before a final decision is taken.
3. Squarepeg, far from consulting on the planned sale, have stated in their Newsletter dated 1st July that the sale had already been completed (or words to that effect) when in fact the sale has not been concluded, so presenting the public with a fait accompli and preempting opportunities for objections to be made. I believe that this may be in breach of their responsibilities in this matter. Again in order to remedy this defect a period of consultation is required before the sale is finalised.
4. The proposed development of the sale land will include a substantial twin-tower block of, I believe, 7 or 8 storeys which will loom over the Railway Path. This proposal is likely to concern a great many path users who have not been involved with the local consultations carried out by Squarepeg and it may even prove to be extremely controversial. Although this matter will presumably be addressed by the consultations on the Planning Application, it would, I suggest, be more appropriate to address it initially as a separate matter along with consultations on the proposed land sale.
Chris Hutt.
Having then copied it to various interested parties, a crescendo of emails followed, including a call from the Evening Post, culminating in the following being copied to me. It is apparently a briefing from Council Officers sent to Councillors this afternoon (my notes added in brackets and non-italics). It seems to be "cover your arses" time in the City Council.
Having then copied it to various interested parties, a crescendo of emails followed, including a call from the Evening Post, culminating in the following being copied to me. It is apparently a briefing from Council Officers sent to Councillors this afternoon (my notes added in brackets and non-italics). It seems to be "cover your arses" time in the City Council.
Briefing Note - Land Adjacent to Former Elizabeth Shaw Chocolate Factory
Strip of land A (The embankment slope coloured blue - click on map to enlarge)

Squarepeg the owners of the Former Elizabeth Shaw Factory in Greenbank contacted the Council in December 2007 over the possible purchase of the land outlined in red on plan N5078b. This Council land is currently leased to the former owners of the Elizabeth Shaw Factory at a rent of £100 pa to be used for an access onto the cycle path and landscaping. Squarepeg's proposals are to incorporate the land within the redevelopment of the former chocolate factory site which is to be developed into a mixed use site of retail, business and residential units.
Several concerns were raised over the potential sale of the land by the Nature Conservation Officer and the Transport Development Control Manager. The initial response was that the Council would not wish to sell the land. Further discussions between chief officers in CLS (Culture and Leisure Services - Parks) and PTSD (Planning Transport and Sustainable Development) and George Ferguson from Squarepeg were held in May 2008. Instructions were subsequently given to Property Services to proceed with the possible sale of this land subject to the following conditions:
1. Squarepeg engage in dialogue with Council's Nature Conservation Officer to ensure the proposals provide necessary but reasonable compensating measures for the loss of vegetation and habitat.
2. The land sale will only be finalised if the developer receives planning permission and proceeds with the specific proposals.
3. Any structural changes to the bank will have to be agreed with the Council before works start. This is to protect BCC against works being carried out which undermine the cycle path.
4. The developer pay market value for the site.
The property was circulated as surplus in June 2008 with no department putting forward a operational requirement for the land within the four week circulation period. A formal offer from Squarepeg is awaited.
Strip of land b (The green verge of the Path along the boundary of the site, coloured green)
In July 2008 Squarepeg showed an interest in acquiring an easement or long lease of an additional strip of land outlined red on plan N5078c. This is required to access their development from the Bristol to Bath Cycle Path. They propose clearing land of vegetation and replacing with grass and landscaping. Squarepeg have confirmed that they would to maintain the site and continue to allow public access onto this land. Should the Council wish to proceed with a lease of the land it would need to advertise the proposal in the local newspaper and invite the public to comment. The matter may also need to be referred to the Parks & Green Spaces Board.
The Council is waiting for written proposals from Squarepeg as to the terms under which they will be looking to use this land.
David Bishop has indicated that he supports the grant of an easement (subject to certain conditions) as this development was referred to in the Cycle City bid application and is seen as a 'cycle friendly' development which will not compromise the future of the cycle path but could potentially improve it. David has indicated that he would be happy to discuss the development with any members should they have any issues with this proposal.
I've not had time to study this properly yet, but one section jumps out at me - "Several concerns were raised over the potential sale of the land by the Nature Conservation Officer and the Transport Development Control Manager. The initial response was that the Council would not wish to sell the land".
So it seems there was a real debate going on within the Council after all, as one would expect with such a contentious issue, but still they didn't see fit to put the matter out to consultation or even refer it to elected members of the Council, let alone inform the people of Bristol. Instead the matter appears to have been stitched up with a secret meeting between Merchant Venturer George Ferguson the Senior Officer David Bishop. That is how Bristol is run under our new £180k Chief Executive Jan Ormondroyd.
(for a follow up post click here)
Saturday, 7 June 2008
Bristol Greenways in crisis

Just as the current plan to convert the Bristol section of the Railway Path (pictured above) to a route for guided buses recedes into the background (conveniently for Bristol's Cycling Demonstration City bid) new threats to Bristol's Greenways emerge .
The first new threat is once again to the Railway Path where teenage gangs are carrying out violent attacks on Path users in the Easton area. Although there has been a history of muggings on this section, the latest outbreak is alarming in its scale and violence, with bricks and baseball bats being used against victims, resulting in many being hospitalised.
These attacks represent just as serious a threat to the Railway Path as the bus route plan. The widespread publicity will inevitably result in a serious drop in use, especially outside peak times, leading to reduced natural surveillance and even more of a sense of isolation and still better conditions for the gangs to operate. Many users recognise this danger and some are determined that this should not happen, but will there be enough of them to counter the appallingly bad publicity?
The second threat to emerge is to the Malago Greenway (pictured below), a route for cyclists and walkers in south-west Bristol following the line of the Malago stream. Although less well known than the Railway Path it is important as a safe and attractive route for many living in that part of the city, as well as being valued as a wildlife corridor, particularly with the adjacent stream.
The threat is once again from a plan for the creation of a Bus Rapid Transit route. As with the Railway Path proposals, there are already signs of strong public opposition to the Malago route, but the BRT promoters cannot afford to lose another route or the whole concept of BRT will become a laughing stock. And the Malago corridor is nothing like as well known outside of south Bristol, so my guess is that this is going to be a tougher battle.
So what's behind this ongoing crisis with Bristol's Greenways? At the root of it is a history of half-heartedness on the part of the City Council who have never really recognised the importance of such Greenways to local people, at least when it comes to investing the resources necessary to adequately maintain, promote and secure these cycling and walking routes. The fact that they have identified a large part of the Greenway network as suitable for rapid transit confirms this lack of commitment.
It's time for Bristol City Council to make up its mind. Does the city want to foster and develop its Greenway network to encourage cycling and walking, as so many of Bristol's citizens clearly desire, or does it want to let them run down through neglect of maintenance and security issues, coupled with endless threats to their longer term future, to clear the way for their true aspirations for more motorised transport?
Subscribe to:
Posts (Atom)