Thursday, 12 November 2009

The Arena - Disconnected Thinking?

It seems that there is now a serious push on to site an Arena (circle below) at Ashton Vale near the site now allocated for a new football stadium (rectangle below), with the Bristol Evening Post once again acting as cheerleader. Bristol's current political leaders all seem to be in favour of an Ashton Vale Arena, partly on the grounds that there is a 'synergy' between the Football Stadium and an Arena in terms of their transport infrastructure requirements, which is true up to a point.


View Arenas and Stadiums in a larger map

But an Arena isn't quite the same as a football stadium, mainly because it is likely to be staging events far more frequently and so having a much more significant impact in transport terms. The inescapable reality is that an Ashton Vale Arena will be accessed overwhelmingly by car even if the Ashton Vale BRT is developed, whereas the site previously envisaged for an Arena near Temple Meads could really make good use of our rail infrastructure and would be much more accessible by walking, cycling and bus due to its central location.


Land at Ashton Vale as it is now, following wanton destruction of trees earlier this year.

George Ferguson has been quick to speak out against the Ashton Vale proposal for this reason. This blog has had its differences with George in the past but once again he is saying clearly and loudly what desperately needs to be said. If we are even half serious about becoming a Green Capital or even just a Sustainable City then we need to think seriously about the transport implications of such iconic new developments as the Arena. Quite apart from the number of trips generated the character of the accessibiltiy of the Arena will send out signals about the future character of Bristol as a whole.

One only has to visit Cardiff Millenium Stadium to see the extent to which its proximity to Cardiff Central Station and its generally central location in the city is the key to its accessibility. Think of the 'synergy' between an Arena at Temple Meads and our rail services, which would receive a big boost during otherwise off-peak periods. The infrastructure and the capacity is there already and has the potential to be increased. Admittedly there is the posibility of some limited rail access being developed near Ashton Vale but this would be out on a limb rather than at the heart of the region's rail network and simply wouldn't have the capacity to replace more than a token amount of car journeys.




So once again those of us who care about the future direction must add our voices to that of George Ferguson and try to point out the contradictions between an Arena at Ashton Vale and a sustainable future for Bristol. Having the Football Stadium at Ashton Vale, just 750 metres further out than the existing football stadium, is one thing but an Arena that will draw crowds from the whole of Greater Bristol and well beyond is something else.

Wednesday, 15 July 2009

Hourbike Launched with a Whimper

A report in today's Evening Post tells us that Hourbike has been officially launched in Bristol with four hubs, each with about 4 bikes, in central Bristol to complement the four pilot sites at Bristol Parkway and UWE (map here). The story includes a quote from my previous blogpost on Hourbike where I gave a predictably downbeat verdict. But it seems I'm not the only one with doubts about the viability of the scheme.



The Cycling City project seem to be disowning the project, claiming that the funding of £12,000 from Bristol City Council isn't Cycling City money and that Hourbike is not part of Cycling City. This is quite remarkable since all the evidence is that this was envisaged as being an integral part of Cycling City. The media certainly gave that impression at the launch of Cycling City last year and nothing was said to disabuse them of that idea.

The Post report says nothing about any official launch ceremony and so we might conclude that Cycling City don't want it to have a high profile. Even the inevitable Jon Rogers quote is quite guarded.
"Anything that encourages people to leave the car behind and find a healthy, sustainable way of getting about the city has to be welcomed. This pilot scheme will give us the opportunity to see what kind of demand there might be for a more widespread network in Bristol. We certainly wish Hourbike all the best."

Damned by faint praise? But it seems that the promoters of Hourbike have more than enough chutzpah to compensate for the fainthearts elsewhere. Dan Cooper, 28, Hourbike's sole employee in Bristol and nephew of Hourbike boss Tim Caswell (now, now, let's not hear the N word), said
"This can definitely work in Bristol. It cannot fail as an idea."

Mr Cooper goes on to say that there could one day be 2,000 of their bikes on the streets of Bristol (and will it endure for a thousand years too?). But he neglects to mention that the best known automated bike hire schemes, in Paris and Barcelona, were actually launched with thousands of bikes available from hundreds of locations, not just eight hubs that don't as yet even include the central railway station (a minor detail overlooked by the promotional video below).



According to Mr Cooper there are plans to open new hubs, subject to planning permission, in Temple Meads and Temple Quay. One wonders why they need planning permission at these locations but not elsewhere, and why have they been so tardy about progressing a hub at such a key location as Temple Meads. Are First Great Western perhaps lukewarm about encouraging cycling or getting cold feet about their involvement?

If Mr Cooper and family are so confident about the future success of the Hourbike project why have they come cap in hand for public funds to support it instead of raising the funds privately? Surely if it "cannot fail" then it can only succeed and prove a profitable venture? Or is it that no private investor will touch it with a barge pole?



Video summary. Desperation (How to get to the train station in 5 minutes?), Pacification (Ah, an Hourbike Hub), Expectation (This is quick, I'll soon be there), Acclamation (Ah, Temple Meads at last), Realisation (There's no fucking Hub here to deposit the bike!).

Tuesday, 14 July 2009

Cycling City - Police Haul Cyclist Off Train

The 'Better by Bike' message of Bristol's Cycling City project doesn't seem to be filtering through to the British Transport Police or railway staff. The email message below was sent today, recording an extraordinary incident at Temple Meads when a cyclist, one of four who had boarded a train with four bicycle spaces, was hauled off by police in riot gear and 'held' in the British Transport Police office (which sounds like being 'arrested' to me). I'll say no more but let you judge for yourselves from this account.
"Recently my son had a very unnerving experience at Temple Meads.
He has a part-time lecturing job in Cheltenham, so regularly travels there from Bristol. He goes by train, taking his bike to use at each end of the journey. However this is a gamble as he cannot rely on there being a space on any train for his bike. Bike tickets are issued, but with no guarantee about being able to take the bike on the train it is booked on.

Last month a "rule" was brought in that there could not be more than 3 bikes on any train, even if there were more than 3 bike racks. This is apparently so the provision will be the same on all trains, and the newer trains only have 3 racks.

The train he and his bike were booked on had 4 bike racks, and fortuitously 4 cyclists wishing to travel. However jobs-worth rail staff insisted that one person leave the train. This was obviously nonsense (with no flexibility for a new rule), and it was not clear how it could be decided who had to unlock their bike and leave. All refused, including a woman who became very upset. My son had an important day ahead with external examiners coming to his college, so felt it was impossible to wait for a later train. When he tried to have a (reasonable) discussion with the staff, their response was to call the railway police. 4 police arrived in riot gear, grabbed hold of my son, and held him in their office. He was told he was lucky not to be arrested (so what the justification for his treatment was is unknown).

So this is how the station responds to customer care issues, and the need for transport links to avoid car use. Brilliant."

Meanwhile in a parallel universe....


......where there's a will there's a way.

Saturday, 4 July 2009

HourBike or NineDayWonderBike?

Bristol Traffic just beat me to it with pics of the new Hourbike installations, or hubs, in central Bristol, but at least I managed to find the one tucked away by At-Bristol as well as the one on Colston Avenue. The third is by the BRI and, er, that's it apparently, apart from the existing hubs at Parkway station and the UWE campuses. Map viewable here.

The idea is that you hire a bike near the origin of your journey (or modal transfer point like a railway station or P&R site) and then deposit it at a hub near your destination, so no concerns about bike security when you're not actually using it and no need to pay hire charges other than for the time you're actually riding the bike. Ideal, in principle, for shortish trips around town when you don't have your own bike available.



But with such a meagre distribution of 'hubs' the options are extremely limited. At-Bristol to BRI might just about be worth cycling and the BRI is quite close to the bus station, but either destination to the Colston Avenue hub is such a short distance that it's hardly worth the bother of hiring a bike. A longer journey combined with the use one's own bike lock to secure the bike at the destination is possible, but you'd pay for all the time on hire. And how many people are likely to have a decent bike lock with them?

Temple Meads station is the most obvious 'missing link', so could it be that First Great Western weren't willing to fund a Temple Meads hub, as they had at Bristol Parkway last year? Perhaps the minimal usage of the Parkway hub had given them cold feet? Could it be that a Temple Meads hub is due to appear shortly, before the official launch, whenever that is? As usual with Cycling City funded projects we know little more than can be observed on the ground or via the Internet.



One of the major issues with unsupervised automated bike hire schemes with hubs in public places is the vulnerability of the bikes to theft and vandalism, so let's have a closer look at the details. The bikes are secured by a prong attached to the top of the head tube which looks fairly solid, but the prong appears to be held to the head tube bracket by an allen key bolt. Could it be that all it takes to remove the bike is to undo an allen key bolt?

Another obvious vulnerability, pointed out by Bristol Traffic, is the easy removability of saddle and seat posts via saddle height adjustment mechanisms. BT didn't actually try to steal one, but I did. It doesn't work because at the high limit of adjustment something stops the seat post being raised any further, presumably an enlargement of the very end of the seat post. So at least they've thought of that one.



The lights look extremely vulnerable to damage, which is a shame because it's a neat little lighting system based on an expensive hub dynamo. The rear light could have been built into the rear carrier rack to protect it from casual damage and the front could have had a metal frame built around it for the same purpose. Or they could forget about lights altogether and let users make their own arrangements as and when necessary (which is what I think I would have done).



Both wheels are based on some fancy hubs incorporating brakes and with a dynamo in the front so might be considered desirable by those who appreciate such eminently practical features. The rims and tyres look quite decent too. The wheels are secured by what look like hexagon nuts but which on closer inspection appear to be some special security nuts. I wasn't 'tooled up' yesterday so haven't yet had a serious attempt at stealing bits, but we'll see in due course. I guess all the hub brakes connections would have to be undone too so maybe it's simpler to nick the whole bike.



The actual bicycle frames look cheaply built (crude welding) and clunky, so I don't suppose the bikes as a whole will be coveted by many, but some components are seriously vulnerable. CCTV might be a good idea to deter interference, but there were no signs advertising the presence of CCTV (which signs could be displayed even if there wasn't any CCTV, as on the Railway Path, if one wasn't too scrupulous about honesty - at least the Council shouldn't have any problem with that).

So my verdict, based on what I've seen, is that Hourbike in Bristol will be a nine day wonder and briefly attract a lot of media interest, followed by a longer period where it becomes a standing joke as the bikes suffer attrition but precious little in the way of legitimate use. This is primarily because the existing 'network' is so ludicrously limited. If Temple Meads and a few other central locations, perhaps including Long Ashton P&R, were included then it might have a chance.

Later correction 9 pm Saturday.



I've since discovered that the Hourbike bikes come equipped with a combination cable lock (combination issued on hire) so you wouldn't need to have your own lock. Having said that cable locks are notoriously easy to cut through and then the hirer would be responsible for the loss. Plus previous hirers of the same bike will know the combination. I wouldn't trust one.

Friday, 6 March 2009

It's the Cycle Route wot gets it.

Anyone cycling around Bristol will have noticed that whenever any road works are carried out it's almost always the cycle route, track or lane that gets sacrificed to accommodate the works. Here's an example in Whitchurch Lane, south Bristol where a road widening scheme is underway to improve car access to the new development in Hengrove Park. In this case even the footway gets blocked off (with no alternative available), even on a Sunday when no work is taking place.



The Hengrove Park scheme includes a new cycle path to replace this cycle lane and is therefore receiving Cycling City funding, even though it was already planned and would have been carried out anyway, so in effect Cycling City funds are subsidising a road widening scheme. Some people think that's OK because there's a benefit to cycling, but does turning south Bristol into a mini Los Angeles with massive road schemes and huge scale development really benefit cycling?



If this cycle route is so important that it is designated as part of the new strategic multi-million pound Cycling City network, why do the authorities think it acceptable to deprive cyclists of what little comfort is afforded by the cycle lane during the road works? Could it be that there is negligible cycling demand on this route and it is being designated as part of Cycling City purely as a pretext for tapping into CC funds?



Hengrove Park was once the site of Bristol Airport (1930 - 1957) and is now looking rather forlorn, so some investment must be welcome, but does it need to be so resolutely car-orientated, with massive areas given over to car parking and access roads? Would it be asking too much for Hengrove Park to be developed as an exemplar of car-free living, given that it could be the focus for a lot of "alternative transport" investment with rapid transit and cycle routes, something worthy of Bristol's Green Capital aspirations?



Back to cycle route closures. Here's a recent example from nothing less than Sustran's National Cycle Route NCN 3, which runs form Bristol to Land's End, which was closed off next to Bristol Dog's Home beside the River Avon south of Temple Meads. The Closure signs didn't even acknowledge it as a cycle route! A diversion along the busy local road network was vaguely indicated.



In this case we find that the closure should only have taken place when works actually required it, yet it remained in place for weeks, including week-ends when absolutely no work was in progress. On one occasion when I visited, the works causing the Path to be closed consisted of two men in hi-viz jackets leaning against a fence (vaguely visible below - click pic to enlarge). Such is the priority accorded to users of the much vaunted National Cycle Network in our Cycling City.

Monday, 10 November 2008

Barmy BRT

Our old friends the West of England Partnership (Bristol City Council and the three other local councils in what used to be Avon) have launched their proposals for the first of a network of Bus Rapid Transit (BRT) routes in Bristol, running from Ashton Vale to Emerson's Green, only they're leaving a veil over the Temple Meads to Emerson's Green section for the very good reason that they still want to use the route of the popular Bristol & Bath Railway Path, despite the public outcry when this emerged at the beginning of this year.



So the current consultation is for Ashton Vale to Temple Meads, although from Prince Street Bridge onwards to Temple Meads the BRT bendy-buses will run as normal buses already do, using bus lanes and ordinary roads, so it's really the Ashton Vale to Prince Street Bridge section that is new, although for the most part it follows disused or little used railway trackbed, with only the link from Winterstoke road to the Ashton P&R site being a new transport corridor.

To help us visualise how wonderful the brave new world of BRT is going to be the West of England Partnership have produced a computer simulation (below) to show sleek tram-like bendy-buses gliding along pristine tracks and improbably wide streets, all remarkably clear of any other traffic other than a generous sprinkling of cyclists. Of course we're all expected to be duly impressed, especially at how cyclists will benefit from the BRT scheme.



But some cyclists will insist on looking a gift horse in the mouth and one in particular is remarkably vigilant when it comes to the kind of obscure details that most of us scan over. Step forward Terry, who noticed some strange anomalies along the Cumberland Road. Not only do the BRT buses magically switch from the conventional driving on the left to continental style driving on the right (possibly for sound technical reasons), but so too does the adjacent road traffic!

It seems that no one at the West of England Partnership has the attention for detail of our Terry and they've gone and issued a simulation with cars driving on the right through Bristol. This actually sits well with other 'oversights' in the simulation, like the grossly exaggerated widths of cycle paths and roads running alongside the BRT route and the strange 'ghost' station on Winterstoke Road. Once again we have a public consultation being carried out on the basis of misleading and unreliable information.

Thanks to James Barlow for setting up the You-tube video.

Sunday, 9 November 2008

Ministry of Silly Walks



A few weeks ago the Evening Post reported the launch of a new web site, walkit.com, giving walking routes between places in and around Bristol. You can choose the most direct route or a less 'busy' one to avoid traffic. It even tells you the distance, likely journey time and how many calories you burn up and how many kilograms of CO2 you 'save' in the process.

All the power of modern computing dedicated to making route finding a piece of cake. So much better than just pointing yourself in the right direction and hoping for the best. Err, actually no. The database is so sloppily prepared that it often dishes up the most absurd routes that even an inebriate staggering back from a pub crawl would be hard put to rival.

Many hours of amusement can be had putting the site to the test, so I've decided to launch a competition to find the most absurd walking routes. The prizes will be £10 vouchers for consumer goodies from a Clifton deli, one prize will be for the 'direct' walking route with the highest ratio between the walkit route and the real world direct route and the other prize will be for the most 'entertaining' walkit route in terms of its failure to identify the best available walking routes. Competition entries can be posted as a comment below.



Here's my entry for highest ratio of walkit distance compared to reality. It's a 2 km walk from Pill to Shirehampton, which of course can be made via the Avonmouth Bridge (above) in about 20 minutes. But not if you follow walkit, which will send you on a 3 hour, 14 km trek via the Clifton Suspension Bridge, which gives a walkit/reality distance ration of 7! That's good but not necessarily unbeatable. Remember it's the ratio that scores, not the distance differential, so quite short walks can and often do throw up equal absurdities.



And here's my entry for the most entertaining category. It's from Temple Meads station to Princess Street in the Dings, just the other side of the River Avon, and as we all know there's an almost perfectly straight link between the two using the Dings Railway Path (above) and the Cheesegrater Bridge, but walkit send us on a much more entertaining route around the houses, doubling the distance and of course the calories consumed, so they obviously have our best interests at heart.

But before you get carried away with the idea of calculating your annual calorie consumption and/or carbon savings you might like to compare a journey from say the bottom of Park Street to the top, and then the other way around. Yes, you guessed it - the calorie consumption figure is the same. In other words the site takes no account of gradients, which in a city like Bristol is quite a significant consideration.

I hear that the same bunch of incompetents who cobbled together the walkit site are now working on a cycling site, presumably to be called bikeit. This should be even more amusing if previous risible efforts are anything to go by.